New kitchen cabinets being levelled and installed in an Apache Junction, AZ home
Cabinet Installation

Cabinet Installation in Apache Junction, AZ

Kitchen, bath and laundry cabinets set level and true — with the plumbing behind them done by the same people.

  • 4.7★ from 20 Google reviews
  • Licensed & insured — AZ ROC CR-37 Plumbing
  • 60+ years combined experience

Short answer

Cabinet installation looks like carpentry and is half plumbing: a vanity has to land over supply stubs and a drain roughed in for a specific height, and a sink base has to clear a disposal, a filter housing and often an RO tank. Getting those checked before you order is a ten-minute step that prevents the most common problem there is.

Cabinet installation looks like carpentry and is half plumbing. A vanity has to land over supply stubs and a drain that were roughed in for a specific height and offset. A sink base has to clear a disposal, a filter housing and often a reverse osmosis tank. A laundry cabinet run has to work around a standpipe and box.

When those are handled by different trades on different days, the result is the cabinet that will not sit flat against the wall because a drain is in the way, or the vanity that had to be cut out at the back on site.

We do both. That means the rough-in gets set for the cabinets you actually chose, and if something needs moving, the person who can move it is already there.

Cabinets going in?

Send us the spec sheet before you order. Checking it against your rough-in takes ten minutes and prevents the most common problem there is.

(207) 419-2600

What we install

  • Full kitchen cabinet runs

    Base, wall and tall cabinets set level and true, scribed to walls that are never quite straight.

  • Bathroom vanities

    Including comfort-height conversions, which change where the supply and drain need to land.

  • Laundry and utility cabinets

    Worked around standpipes, boxes and water heater alcoves rather than fighting them.

  • Garage and storage cabinetry

    Practical storage in a space that hits 120 degrees — material choice matters more than people expect.

  • Cabinet refacing

    Where the boxes are sound and the budget does not stretch to replacement. A genuinely good option on solid older cabinets.

  • Replacing water-damaged sink bases

    The most common single-cabinet job we do. Usually a slow supply leak nobody noticed.

What a cabinet installation job includes

Every quote covers the items below. If something is not on this list, it is not in the price — and we will say so before we start.

  • Rough-in measured against your chosen cabinets

    Supply and drain locations checked against the actual specification before anything is ordered.

  • Installation quoted separately from the cabinets

    So you can buy product wherever you like without the labour price moving.

  • Plumbing corrected while access is open

    Angle stops upgraded to quarter-turn, tired supply connectors replaced, drain height adjusted or relocated as needed.

  • Levelled from the floor high point

    Every cabinet references one line. Getting this wrong compounds visibly across a run.

  • Joined before fastened, then scribed

    Cabinets screwed to each other first so faces stay flush, then scribed to walls that are never quite square.

  • Reveals adjusted and hardware fitted

    Consistent gaps around doors and drawers, toe kick and trim completed. It is the detail that reads as quality.

Why the sink base fails first

If you are replacing one cabinet in a house, it is almost always the kitchen sink base or a bathroom vanity, and it is almost always because of water.

Particleboard and MDF cabinet floors absorb water and never recover. A slow drip from a supply connection, an angle stop weeping, a failed disposal gasket or a drain slip joint that was never quite tight will destroy a cabinet floor over months while looking like nothing more than a damp patch.

When we replace one, we deal with the cause rather than just the cabinet: check and replace the angle stops with quarter-turn valves, replace tired supply connectors, reseat the drain assembly properly, and check the disposal mounting and the dishwasher connection.

It is also the right moment to add a leak sensor under the sink. They cost very little, and in a cabinet nobody looks inside more than twice a year they turn a destroyed cabinet floor into a text message.

Installation is about walls, not cabinets

Cabinets are square. Houses are not, and stucco-over-frame construction in this region is no exception.

A proper installation starts with finding the high point of the floor and establishing a level line from it, then locating and marking studs, then hanging wall cabinets before base cabinets so there is room to work. Cabinets get shimmed level and plumb, joined to each other before they are fastened to the wall, and scribed where they meet out-of-square walls so the filler strips do not show a tapering gap.

Doors and drawers get adjusted at the end — modern European hinges adjust in three directions, and a run of cabinets with consistent reveals is the difference between a professional job and an obviously amateur one.

Countertop support matters too. Quartz and granite need proper support at overhangs and dishwasher openings, and that has to be planned during cabinet installation rather than discovered on template day.

Kitchen cabinets being leveled and scribed to the wall in Apache Junction
  • Level from the floor high point

    Every cabinet references one line. Getting this wrong compounds across a run.

  • Joined before fastened

    Cabinets screwed to each other first, then to studs. This is what keeps faces flush.

  • Scribed to the wall

    Fillers cut to follow the wall so gaps do not taper visibly.

  • Reveals adjusted last

    Consistent gaps around doors and drawers. The detail that reads as quality.

How a cabinet job runs

  1. 1

    Measure and check the rough-in

    Cabinet dimensions against actual supply and drain locations, before anything is ordered.

  2. 2

    Quote with allowances

    Installation quoted separately from the cabinet allowance so you can choose product freely.

  3. 3

    Remove and inspect

    Old cabinets out, and an honest look at the wall, floor and plumbing behind them.

  4. 4

    Correct the plumbing first

    Angle stops, supply lines, drain height and any relocation done while access is open.

  5. 5

    Install level and true

    Layout line established, cabinets joined, shimmed, scribed and fastened to studs.

  6. 6

    Adjust and finish

    Doors and drawers aligned to consistent reveals, hardware fitted, toe kick and trim completed.

What drives the price

Installation is quoted separately from the cabinets themselves, so you can buy product wherever you like without the labour price moving.

Number of cabinets and runs
A single vanity versus a full kitchen with wall, base and tall units is an entirely different scope.
Whether plumbing has to move
A vanity that lands over the existing rough-in is straightforward. A different height or offset means relocating supply and drain.
Wall and floor condition
Out-of-square walls, uneven floors and damaged substrate all add scribing, shimming and repair time.
Removal and disposal
Old cabinets out and hauled away, including water-damaged units that come apart rather than lift out.
Refacing versus replacing
Refacing sound boxes costs meaningfully less than new cabinetry and is a genuinely good option on solid older units.

Every quote is written, and the number does not change afterward. AZ ROC CR-37 Plumbing · BBB A+ accredited.

Why AllStar Home Services for cabinet installation

  • We fix the cause, not just the cabinet

    The most common single-cabinet job we do is a water-damaged sink base. We replace the angle stops and supply connectors that destroyed it, and suggest a leak sensor so it does not happen twice.

  • Plumbing, HVAC and remodeling in one company

    BBB accredits us under Plumber, Bathroom Remodel, Remodel Contractors and Drywall Repair. One contract, one crew, nobody pointing at somebody else.

  • The quote is the price

    You hear the number before we start and it does not move afterward. It is the single thing customers mention most in our reviews.

  • Based at 870 W 15th Ave, not a call centre

    Shane, Leo and Justin live in Apache Junction. Most of the city is a ten to fifteen minute drive rather than a cross-valley dispatch.

Where we provide cabinet installation

Cabinet work follows our kitchen, bathroom and renovation projects across the whole service area. We deliver this from our 15th Ave shop across Apache Junction and Gold Canyon, then out through Queen Creek, San Tan Valley, Mesa, Gilbert, Chandler, Tempe and Fountain Hills.

Further out we cover Florence, Coolidge, Casa Grande, Maricopa, Eloy, Superior and Mammoth, and we are honest about when a small job does not justify the drive. Refacing is worth considering on the older Apache Junction and Mesa stock, where plenty of original boxes are built better than modern budget units — if the boxes are sound and the layout works, it costs meaningfully less than replacement.

All service areas

Cabinet Installation questions, answered

Yes, and most customers do. We quote installation separately from the cabinet allowance so you can buy from wherever you like. Bring us the specification sheet before you order and we will check the dimensions against your actual plumbing rough-in — that ten-minute check prevents the most common cabinet installation problem there is.

Related reading

  • Heavy calcium scale buildup inside a pipe cut open from an Apache Junction, AZ homeHard Water

    How Hard Water in Apache Junction Destroys Your Plumbing

    At 15 to 25 grains per gallon, Apache Junction has some of the hardest water in the country. Here is what that mineral is actually doing inside your pipes, your water heater and your fixtures — and the maintenance that changes the outcome.

    7 min read
  • Permit and inspection paperwork alongside a completed water heater installation in Apache Junction, AZHomeowner Guides

    Plumbing Permits in Apache Junction & Pinal County

    A cheaper quote that skips the permit is not cheaper — it is a cost you pay later, at resale or at claim time. Here is what needs a permit and how to verify who you are hiring.

    6 min read

Cabinets going in?

Send us the spec sheet before you order. Checking it against your rough-in takes ten minutes and prevents the most common problem there is.

  • 4.7★ · 20 Google reviews
  • Licensed & insured
  • BBB A+ accredited
Call NowFree Quote